Begin with the project specification
For structural steel fire-protection work, include the relevant drawings, fire-engineering requirements, specified system and project contacts. Tell us whether the work is new construction, an alteration or maintenance of an existing coating.
The required coating system and application details need to follow the project specification and manufacturer guidance. Confirm who is responsible for design, application, inspection and the documents required for your project.
An enquiry or painting quotation does not establish approval of a fire-protection system or guarantee a building compliance outcome.
What to establish before booking
- Specification and existing coatings: Provide the proposed system, steel details and any information about existing primers or coatings. Compatibility needs to be established for the specified system.
- Applicator requirements: Confirm the training, approval or experience required for that product and project, and obtain evidence from the proposed applicator.
- Inspection and records: Agree on the required inspections, application records, handover information and the parties responsible for each.
- Programme and access: Share the construction programme, access restrictions and coordination needed with other trades. Confirm availability and the scope before relying on a completion date.

Confirm the documentation for this project
Ask your project team and building consent authority which documents they require. A producer statement is supporting evidence in the consent process; this page does not promise that a particular statement will secure sign-off.
For background, see MBIE guidance on producer statements and the Fireshield technical information. Confirm the proposed applicator’s credentials for the specified system before booking.
Use the form below to begin the discussion. It does not accept file attachments; mention the documents available and how you prefer to be contacted to arrange sharing them.
Questions about your project
Provide details of the existing coating and proposed system. Suitability and compatibility need to be established against the manufacturer and project requirements before a method is agreed.
No. Confirm the design, inspection and evidence requirements with the responsible project professionals and building consent authority.
Describe it separately in the enquiry. Do not assume it is included in a structural steel coating scope; service availability and responsibility need confirmation.
Start with the site location, scope, stage of construction, preferred timing and project contact. Mention the specification and drawings you have available.
Discuss your Tauranga coating requirements
Share the property location, work required and preferred timing.
Phone: 0800 866 272
Tauranga · Mount Maunganui · Papamoa
Get a quote for your painting project
Tell us what needs painting, where the property is and your preferred timing so we can discuss the next step.
- Free, no-obligation quote
- Preparation, materials and scope explained
- Timing and access discussed before work starts
Prefer to talk through your project?
Call 0800 866 272Our team replies within three business days. If timing is urgent, please call.
Also serving Ōmokoroa, Te Puna, Te Puke and Katikati.
Your quote request has been sent
Thank you for contacting Tomar Contracting. Our team will reply within three business days to discuss your project and the next step.
If you need to speak to us sooner, call 0800 866 272.
Explore More
Popular Services, Areas, and Resources
Painting Services
- Exterior House Painting
- Interior Painting & Decorating
- Roof Painting (Residential)
- Spray Painting Services
- Gib Stopping & Plastering
- Plaster & Monolithic Care
- Cedar Oiling & Restoration
- Fence & Deck Staining
- House Washing
- Colour Consultation
- Commercial Painting
- Industrial Coatings
- Commercial Roof Coatings
- School & Facility Maintenance
- Intumescent (Fire) Coatings